Project Type
Multi-Phase

Delivery Method
Design Build

Completion Date
March 2009

Northbay Medical Center

Fairfield, CA

building exterior of northbay medical centerA 2,225-square-foot remodel that combined two operating rooms into one state-of-the-art hybrid operating room. This multi-phase project was performed with uninterrupted service to the other ORs. It included the installment of integrated cardiovascular monitoring, lighting, sound, and video systems. Electrical work included power, conduit, and connection for HVAC units to energy management system; conduits and raceway for data connections; and code blue and staff assist to tie in to local system. Upgraded HVAC system to provide adequate cooling for suite. Mechanical upgrades included new plumbing, pipe fixtures, relocation of Med Gas and fire sprinkler heads as required for new OR suite layout. Aging wood structure, framing, and doors were updated for desired department layout. Both the men’s & women’s locker rooms were remodeled with the restrooms for ADA compliance. Also added were new lighting, casework, and finishes.

Print Project Profile (PDF)